Current Location: Home Supervision

Supervisor said

Source: Time: 2020-01-08 22:32:19

Millennium Tongzhou vitality north stream

Many people have introduced the supervision to the older generation. What large projects require supervision and supervision, but many home improvement companies in the market also have supervision. They are responsible for the quality of the decoration of ordinary owners. Development, the supervision of many decoration companies can not fulfill their due responsibilities according to their wishes (or life is forced, the market is forced), more often they play the role of double reed, on the one hand fooling the owner, on the other hand Rubbing the buttocks on the decoration company eventually turned into a display. If the owners are pitted by the decoration company during the decoration process, a large part of the owners will have nowhere to complain, and gradually they will have an exclusion to this industry. Ten decoration nine pits, there is a special pit, compared to the decorated people have a feeling of being played by the decoration company on the palm, as small as guerrillas, as large as the brand decoration company. In fact, they all have their own routines. After all, they take interests as the starting point, and marketing is the main body of their company, not service. At least from the perspective of the commercial structure, the decoration company is a pseudo-proposition, because the technical staff who serve the owners can completely provide services to the owners, but they lack the corresponding system and management. The existence of the decoration company solves some of the management problems, but It did not reduce the cost, but increased the unnecessary expenses of the owner. At least the decoration itself does not need the concept of brand premium at all. It is more a manual service. Who wants to spend 100,000 yuan to decorate, 30,000 yuan will advertise to the decoration company, and go to the next owner?
Therefore, as an owner, we need to have good home improvement services, and we also need good home improvement codes to avoid the above-mentioned unreasonable and unscientific decoration problems. Due to factors in the market environment, currently only through professional third parties Home improvement supervisors come to avoid some common problems. Earlier third-party home improvement supervisors were mostly transferred from civil engineering. They could not afford high returns and could not pick up low-end consumption. Therefore, they could only be reduced to "nanny" for some rich people and supervised the company for them. . Today, with the explosion of informatization, we are fortunate to be exposed to more and more Internet entrepreneurship projects. [Supervisor said] is one of them. I wanted to use third-party supervision to avoid most of the fools in the decoration market, but it was burning off. After investing 1 million angels, they did not see how many people in the market recognized the so-called third-party home improvement supervision, but the renovated people strongly recommended their friends to choose the third-party supervision. This is a sad market phenomenon, always After being deceived, they were forced to choose to accept it. No company can change this industry by itself, and the same [supervision] cannot change everyone's decoration concept, but at least it can help owners who choose third-party supervision to avoid most of the messy decoration, sometimes really obsessed, sometimes But for a joke (There are two special pitfalls in China, one is to see a doctor and the other is decoration).
No matter how crowded out some decoration companies are in the industry, the market is optimizing, and consumption patterns are also improving. Maybe there is no third-party home improvement supervision in the market. Maybe the decoration was like the decoration company said at the time, rest assured, save money, save time! But now the owner's benefits are delivered to those conscientious enterprises, as well as third-party home improvement supervision. I hope they can solve all the decoration problems, and return the owner a transparent decoration, an industry that is not talked about.
Finally, I will give you some decoration specifications and related terms, and use legal means to guarantee our legal rights of decoration owners!
Construction and acceptance specifications
Xi'an Carpenter Network Technology Co., Ltd.
Foreword
This standard is in accordance with the requirements of the Ministry of Construction Jianbi [1998] No. 244 "Notice on Issuing the National Engineering Standard Development and Revision Plan (Second Batch) for 1999 Project Construction". Relevant units have jointly revised the "Code for Construction and Acceptance of Building Decoration Engineering" (JGJ73-91) and "Standard for Quality Inspection and Evaluation of Building Engineering" (GBJ301-88) and the "Code for Quality Acceptance of Building Decoration Engineering".
During the revision process, the standardization team carried out a special study and conducted a wide range of investigations and studies, and summarized the years of experience in the design, materials, and construction of building decoration projects. The method of “means, process control” was comprehensively revised, and the opinions of relevant units were widely solicited in various ways. The main issues were repeatedly revised, and finally reviewed and finalized.
This specification is a quality acceptance specification that determines whether the decoration project can be delivered for use. The building decoration works are divided into 12 sub-segment works according to the construction technology and decoration parts. The quality acceptance of the works is regulated by this specification.
In order to improve the quality of the specification, in the process of implementing this specification, all units are requested to pay attention to summing up experience, accumulating data, and feedback relevant opinions to Xi'an Supervision Network Technology Co., Ltd. at any time for reference in the future revision.
Compiling institutes of this specification: Xi'an Supervisor Network Technology Co., Ltd.
Participated in this code: Beijing Construction Engineering Quality Supervision General Station
China Construction First Bureau Decoration Company
Shenzhen Construction Engineering Quality Supervision and Inspection Station
Shanghai Huili (Group) Company
Beijing Jianyi Construction Engineering Co., Ltd.
Construction and acceptance standards for hydropower reconstruction projects
project
standard
inspection method
Passed (√)
Hydroelectric materials
Wire national standard: BV2.5mm2, air-conditioned kitchen BV4mm2, 16-wire pipe, 86 (118) bottom box, water pipe ppr20 water pipe
Meet standards, meet budget labeling
Electric circuit
General situation: The general socket of the kitchen is 1m from the ground, the range hood is 2.2m from the ground, the air conditioner is 2.0m from the ground, the switch is 1.2m from the ground, the bedside socket is 0.9m from the ground, and the common socket is 0.3m from the ground (maintain the same height according to the original socket )
Tape measure to maintain a uniform height
waterway
Waterway: left hot right cold, water heater hot and cold height: 1.8m
Mixing valve height: 1.2m spacing: 0.155m, ordinary water outlet is 0.4m above the ground
Tape measure to maintain a uniform height
Requirement: The circuit runs through the tube, neat and uniform, horizontal and vertical, strong and weak separation, a group of 3, water pressure test: 0.6-0.8mpa, half an hour pressure drop does not exceed 0.05mpa
Owner acceptance signature
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner confirms:
Construction and acceptance standards for waterproof projects
project
standard
inspection method
Passed (√)
waterproof material
Comply with national standards using polyurethane flexible materials, in line with contract standards
Meet the standards, meet the budget label brand, the owner signed and confirmed
kitchen
The corner of the nozzle is not leaking, and the ground is turned up to 0.4m and painted twice.
Closed water test for 48 hours to check for leaks downstairs
bathroom
Brush in watery area 1.8m high, turn up 0.4m in cross area 2 times
Closed water test for 48 hours to check for leaks downstairs
Remarks:
Owner acceptance signature
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Construction and acceptance standards for woodworking suspended ceiling projects
project
standard
inspection method
Yes (√)
Ceiling shapes and materials
The shape meets the design requirements and the materials meet the contract standards.
Owner confirmation, acceptance, signature
Ceiling keel
Generally use 3 * 4 type wood keel, light steel keel generally use 38 or 50 type
Meet design and budget requirements
Lighting installation
The bottom of woodwork boards for lamps or accessories with a weight of more than 3 kg is firmly connected to the load.
View now
Ceiling decorative panel
Allowable error (mm)
Material selection according to contract
Drywall
Aluminum gusset
PVC
flat surface
≤3.0
≤2.0
≤2.0
Observe or measure
Straight seams
≤3.0
≤1.5
≤3.0
Observe or measure
Ceiling level
± 5.0
± 5.0
± 5.0
Observe or measure
Appearance effect
No pollution, cracks, chipping, no leakage, no embroidery, all gypsum board ceilings are self-tapping fixed, leaving V-shaped seams
Observed
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Facing brick and stone project construction and acceptance standards
project
Stone tolerance mm
Facing brick tolerance mm
inspection method
Yes (√)
Smooth
Hemp noodles
flat surface
≤1.0
≤1.5
≤1.0
2m tape measure
Main face vertical
≤2.0
≤3.0
≤2.0
Horizontal ruler measurement
Yin Yang Corner Founder
≤2.0
≤3.0
≤2.0 (2 degrees)
Inside and outside right angle detection ruler measurement
Seam height
≤0.5
≤1.0
≤0.5
Tape measure
Note: The paving is firm, the floor tiles must not have empty drums, the single-piece empty drum rate must not exceed 3%, and the overall must not exceed 5%. The floor drain should be found on the slope. The water level test should be performed.
Remarks:
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Construction and acceptance standards for wall top finishing projects
project
standard
inspection method
Yes (√)
Base plaster
Wall, top base, wall surface by ruler measurement, plaster leveling,
Live view
Make up
Self-tapping antirust treatment, kraft paper seam treatment, wall crack grid cloth treatment,
Live view
Yin Yang Corner
Level the yin and yang corners and apply the corners
Live view
Plaster line
After leveling, once the putty is finished, the plaster line is laid
Live view
Second putty
Full batch of putty
Live view
Third Putty
Putty is required in all batches to have a smooth wall surface, no hollow drums, no peeling, etc.
Live view
Sanding
Putty wall polishing
Live view
Test items
Allowable error
Inspection method
Surface roughness
≤2.0
2m feet detection or eye inspection
Facade verticality
≤3.0
2m feet detection or eye inspection
Yin Yang angle verticality
≤2.0
2m feet detection or eye inspection
Yin Yang angle squareness
≤2.0
Inside and outside right angle detection ruler measurement
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Installation and acceptance standards for main materials
Kitchen and bathroom ceiling installation and acceptance specifications
project
standard
inspection method
Yes (√)
Ceiling style
Meets design and contract requirements
View
Ceiling material
Main keel, triangle keel, main keel hanger, triangle hanger, φ6 iron expansion tube, corner line, gusset plate,
View now
Installation size requirements
Standard tolerance
Surface roughness
≤3mm / 2m
View by ruler
Seam height difference
≤0.5mm
Plug gauge, view by ruler
Stitching seam
≤0.5mm
Plug gauge
Appearance and appliances
No flicker, flicker, heating and ventilation work normally, no resonance, no color difference on the surface, no scratch
Observed
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Cabinet installation and acceptance specifications
project
standard
View by
Yes (√)
Door drawer
The surface is intact and flat, the height is the same, no damage, no scratches, the gap is ≤ 4mm, and there is no abnormal noise during opening and closing.
Live view
Cabinet
The panel is intact and the level is the same. There are 4 corner legs in a single cabinet. If it is more than 1m, add 1 or 2 corner legs.
Live view
mesa
No scratch damage, four-way horizontal, rear water-resistant gap ≤ 3mm, glass glue closed, no seam marks when viewed from 2m,
Live view
Hardware
Screw, self-tapping edge connection flat, no looseness, floating nails, missing nails, broken nails, top crack
Live view
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Code for installation and acceptance of paperwork
project
standard
inspection method
Yes (√)
Wallpaper style
The patterns and styles meet the design and contract requirements.
View design contract requirements
Basement membrane
Environmental protection, roller wall painting, construction after drying
View design contract requirements
glue
Environmental protection, divided into rubber powder, wet glue
View design contract requirements
Paving
Reliable paving, no delamination, no bagging, no lifting
The surface is flat, the color is consistent, and the stitching is consistent
(Observation from 1.5m away)
No cracks, wrinkles, stains, glue marks
Observed
Precautions
The construction windows are closed, the ground is moisturized, and the dryness is mainly 5-7.
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Code for installation and acceptance of wooden doors
project
standard
inspection method
Yes (√)
Appearance and material
Material and style meet design and contract requirements
No obvious color difference, no damage on the surface, no scratches,
View contracts and designs
Door cover installation
Door sleeve assembly connection is tight, flat and without black seams; fixed fittings are locked tight; diagonals should be accurate
Observed
Allowable error
Diagonal 1≤mm, verticality ± 2mm, horizontal and vertical ± 1mm
Spirit level, line drop view
Socket installation
The installation should be evenly glued and fixed to the door cover and the wall, and the cable connection interface is flat and tight. After installation, the cable connection on the same side is on the same plane; when the wall is uneven, the cable connection interface must be flat. Sleeving of the thread is ± 1mm. Apply sealant to seal the gap between the thread and the wall
Observed
Door leaf installation
The door leaf is installed flat and vertical, and the door leaf is level with the exposed surface of the door cover. There is no abnormal noise when opening, and it is flexible and does not leave the fan.
The gap between the door cover and the door leaf is 6mm, and the remaining three sides are 2mm; the gap allows ± 0.5mm;
After the door is closed tightly, it is tightly combined with the sealing strip without swinging.
Observation, switch view
Hardware
The hinge is vertical and flat, and the screws are installed completely and straight, hidden from the plane of the hinge.
The door lock is slotted accurately and standardly; it should be fastened, freely unlocked, flat, vertical, door suction, door closers, etc. should be installed at the specified position, and firmly installed,
Observation, switch view
Precautions
No scratches, breakages, seams
Door leaf length and width tolerance is ± 2mm, thickness is 1 ± mm. Twist ≤ 2.5mm.
Observed
Remark
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Sanitary installation and acceptance specifications
project
model
Acceptance content
Yes (√)
Toilet and squat installation
□ Intact appearance, □ Flush water normally, □ No water leakage, □ Accurate position, □ Angle valve normal, □ Water supply is smooth □ No water leakage
Basin mixer installation
□ Intact appearance, □ Hot and right cold, □ Flush water normally, □ No water leakage, □ Solid installation, □ Angle valve normal,
Bathroom cabinet installation
□ The appearance is intact, □ The position is right, □ The height is appropriate, □ Installation is stable, □ Horizontal and vertical
Shower installation
□ Intact appearance, □ Normal water discharge, □ Normal switching, □ No water leakage, □ Suitable height, □ Stable installation, □ Horizontal and vertical,
Remarks:
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Lighting and panel installation and acceptance specifications
project
standard
Allowable error
inspection method
Yes (√)
switch panel
Firm, straight, flexible switch, no looseness
Difference between adjacent heights
Height difference in the same place
Vertical difference
Observation
Socket panel
Firm, straight, without looseness
Difference between adjacent heights
Height difference in the same place
Vertical difference
Observation
Lighting installation
Meet the design and purchase requirements.
Straightness error of adjacent downlights ≤3mm
Observed
The overall acceptance result: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms:
Floor installation, installation and acceptance specifications
project
standard
inspection method
Floor style
Brand, style meets design and contract requirements
View now
Moisture pad laying
Thickness ≥3mm, seams overlap ≥100mm, corner up 50mm
Requirements: flat, tightly bonded seam tape
View now
Floor installation
Allowable error
Solid wood floor, bamboo floor
Laminate flooring
Laminate flooring
Assembly height difference
≤0.5㎜, the surface paint film must not be damaged
Multi-layer structure, ≤0.2mm; three-layer structure is the same as the left
≤0.2mm
Feeler or coordinate dial
Assembly gap wide
≤0.5㎜, not more than 3 places where the maximum seam is 1.0㎜ per 10 m2
≤0.25㎜, not more than 3 places where the maximum seam is 0.5㎜ per 10m2
≤0.25㎜No more than 3 places with a maximum stitching seam of 0.5㎜ per 10m2
Feeler
Requirements: No scratches on the surface, no damage, no abnormal noise during walking, and 8-10mm expansion joints should be left on the floor and wall.
Baseboard and profile installation
Allowable error
The gap between skirtings and door frame is ≤2mm; the height difference between skirtings should be ≤1mm. Difference in flatness of skirting board <3mm, difference in patchwork straightness <2mm
The door buckle should be installed directly below the door, and the gap between the buckle and the bottom of the door is between <6mm. The profile is installed firmly and stably,
Remarks:
Owner signature acceptance
Results of the whole experience: (Passed) / (Failed)
[Supervision said] Supervision acceptance comments:
Acceptor: Acceptance time:
The owner signs and confirms: